×
Close
Close
Miss Loi avatar

Thank You Singtel

(3)
Tuition given in the topic of Study Break from the desk of Miss Loi at 5:01 pm (Singapore time)

Updated on

Just in case the main message got lost amongst the babbling below, This website will be down this Sunday 17 June, 1-3pm (Singapore Time). Maybe even longer. The public is advised not to be alarmed.

Could these have actually brought down Miss Loi's mighty blog? Apologies to those of you who dropped by these two days only to wonder if this blog has been bombed (*oops* did she just used that word?) to oblivion. Apparently Miss Loi couldn’t access her beloved site (emails and all) either and was also wondering if it has been b— (*ahem*).

Soon enough, she received an update from her webhost containing some very, very profound explanations for the outages (see below).

A concerted effort from her webhost and her Trusty Webmaster in translating them into modern English led her to these revelations:

  1. Jφss Sticks actually resides in a “pan-Asian chain of world-class data network centres, owned, built and operated by SingTel … Offering a suite of top-grade Managed Hosting Telco services with complete end-to-end monitoring and management capabilities”
  2. Contrary to her initial thought, this “pan-Asian chain of world-class network centres” has not been “bombed to the point that for the next thousand years, not even a single lizard will survive”. Instead, the cause was more likely due to some stupid intern accidentally tripping loose some power plugs!
  3. Most importantly, to cater for the time needed for this stupid intern to hail one of the 20,000 taxis plying the streets of singapore *shuddles*, go to an electrical store in Jalan Besar to buy new plugs, and then have lunch at the famous Scissors Curry Rice, and then buy 4D/Toto … , and then trying to hail another one of the 20,000 taxis plying the streets of singapore, and finally returning at last to plug in the new plugs, this website will be down this Sunday 17 June, 1-3pm (Singapore Time)!

You have been warned, unfortunately.

Obviously they must have their own reasons, but Miss Loi couldn’t help feeling a little peeved at them for scheduling this relatively long downtime in a busy afternoon. Tsk tsk tsk!

Anyways, Miss Loi welcomes anyone who can help shed some further insight on this very, very profound explanation below.

The Very, Very Profound Explanation

———————————————————

Interim IR – Com III UPS Interruption – 14Jun07.doc 1
Restricted only when filled completely
Unless indicated, document is “Uncontrolled” when printed.
Interim Incident Report
Items
Descriptions
Remarks
Reported by:
SINGTEL EXPAN Operations
Site:
COM III Data Center, Level 2
Date of incident:
14/06/2007
Time occurred:
1414hrs
Date/Time Reported:
14/06/2007 at 1414hrs
Date/Time Resolved:
14/06/2007 at 1416hrs
Review by:

Problem Descriptions:
14 June 2007
1414hrs – UPS fault alerts for UPS 2-3 and 2-4 were received by NOC. UPS 2-3 & 2-4 provide power to equipments hosted in COM III, Level 2 EXPAN Data Centre.
1415hrs – Onsite UPS engineer was activated immediately to check on the UPS.
1416hrs – UPS power was restored.
Findings:
Review of the UPS logs shows that UPS 2-3 and 2-4 inverters were off at 14:14:41hrs and 14:14:42hrs respectively and the load was not transferred to static bypass source. The PCB controller (Control and Communication board) is determined to be faulty.
Immediate Resolution:
Immediate resolution to prevent the UPS from going offline is to replace the PCB controller:
1. 2 hrs maintenance window is required
2. Customer loads will be transferred to External bypass source so that replacement of the faulty PCB controller (Control and Communication board) and a complete test of the UPS systems can be carried out.
3. Customer loads on External bypass source will be supported by Raw power source during the maintenance period.
4. Due to the faulty PCB controller, there will be a power disruption of up to 10mins when the transfer of load to external bypass is performed.
5. The proposed maintenance window will be scheduled as stated below:
Date/ Time: 17/06/07, SGT 1pm to SGT 3pm
Recommendations to customer:
1. Customer is required to shutdown all their equipments before commencement of the maintenance window before SGT 1pm. (For those whom have subscribed to manage system services, Singtel will assist in the shut down of equipments on 17/06/07, starting from SGT 11.30am)
2. Once the faulty UPS parts are replaced and complete testing of the UPS systems are carried out, SingTel will inform customer via email/ phone to start up their equipments.
Interim IR – Com III UPS Interruption – 14Jun07.doc 2
Restricted only when filled completely
Unless indicated, document is “Uncontrolled” when printed.
3. After the maintenance is completed, customer is required to start-up all their equipments. (For those whom have subscribed to manage system services, Singtel will assist in the start-up process.)
Remarks:
Feel free to contact us should you require further clarification.
We sincerely apologized for the inconvenience cause.
——————————————————–

頑張って!!!

Revision Exercise

To show that you have understood what Miss Loi just taught you from the centre, you must:

  1. Leave A Comment!
Comments & Reactions

3 Comments

  1. DK's Avatar
    DK commented in tuition class


    2007
    Jun
    16
    Sat
    10:48am
  2. Miss Loi's Avatar
    Miss Loi Friend Miss Loi on Facebook @MissLoi commented in tuition class


    2007
    Jun
    17
    Sun
    10:22am
     
    2

    DK, just curious if the problem lies with the power supply and they need 2 hours to fix it, don't they have some sort of backup power during this period?

  3. DK's Avatar
    DK commented in tuition class


    2007
    Jun
    17
    Sun
    10:21pm
     
    3

    Usually, ISP would have some sort of backup powersupply.... But then..... this is Sinknet.... or is it stinknet?

    whatever...

Post a Comment

  • * Required field
  • Your email will never, ever be published nor shared with a Nigerian banker or a pharmaceutical company.
  • Spam filter in operation.
    DO NOT re-submit if your comment doesn't appear.
  • Spammers often suffer terrible fates.
*
*

Impress Miss Loi with beautiful mathematical equations in your comment by enclosing them within alluring \LaTeX [tex][/tex] tags (syntax guide | online editor), or the older [pmath][/pmath] tags (syntax guide). Please PREVIEW your equations before posting!

 

Whatsapp Instagram Twitter Facebook Close Search Login Access RSS Joss Sticks Sessions Suggested Solutions Preview O Level Additional Mathematics O Level Elementary Mathematics Secondary Three Additional Mathematics Secondary Three Elementary Mathematics Secondary Two Mathematics Secondary One Mathematics Additional Mathematics 4038 Additional Mathematics 4018 Elementary Mathematics 4017 Virus Zoom Date Modified Address Telephone 非常に人気の Popular Slot! Cart Exam Paper Cart